LIANYUNGANG JM BIOSCIENCE CO., LTD.

Dicyanodiamide/DCD

Dicyanodiamide/DCD
Related Products
  • 3,4-Dimethylpyrazole/DMP

    Based on the principle of soil colloid adsorption of ammonium ion addition of nitrification inhibitor DMPP in fertilizer, control of ammonium into nitrate, and you realize a stable supply of nitrogen,...

  • Nitrapyrin

    Product introductionNitrapyrin is an organic compound with the formula ClC5H3NCCl3. It is a widely used nitrification inhibitor in agriculture as well as a soil bactericide and has been in use since ...

  • 3,4-dimethylpyrazole Phosphate/DMPP

    Product introduction3,4-Dimethylpyrazole (phosphate) (3,4-DMPP) is an inhibitor of nitrification deemed safe by extensive standard toxicology and ecotoxicology tests. 1When utilized on crops, 3,4-DMPP...

Dicyandiamide is commonly used for the curing of epoxy resins.It is a nitrification inhibitor that is capable of reducing nitrate (NO3-) leaching and nitrous oxide (N2O) emissions from soils. China Agriculture Grade Nitrification inhibitor White Powder Cyanoguanidine Dicyandiamide DCDA

White crystal powder, density is 1.40g/cm3 (at 25º C). Melting point is 209-211C, it is soluble in water and alcohol, almost insoluble in ethyl ether and benzene, stable when dry, non-flammable.

Specification of Dicyanodiamide

Product name

Dicyanodiamide

CAS No

461-58-5

EINECS NO

207-312-8

Molecular Formula

C2H4N4

Molecular weight

84.0874

Melting point

209.0-212.0℃

Keyword

DCD

Packing

Net Wt 25kg, 500kg, 1000kg Plastic woven bag 

Description

White crystalline powder

Moisture

≦0.3%

Aassy(HPLC)

≧99.50%

origin

China   

usage

Nitrification inhibitors

Other names

DCD

Brand name

jinma


Payment Term

In Jinama, we have three terms used popularly that are
1. 100% T/T in advance
2. 30% T/T in advance, 70% T/T before shipment(or against Bill of Lading)
3. Irrevocable L/C at sight
Other terms are also available in Jinama, please kindly advise our sales.

Delivery Time

1. stock products: about 10 days
2. Production order: about 40 days to 60 days according to the order list.
3. Other requirements are negotiable.

Leave us Message